The WA Endodontics Dental Fitout proved to be bit of a challenge at first. The tenancy was on a mezzanine floor that could not take the weight load of the new fitout and had a non-compliant entryway. After having a new floor engineered we tackled the entryway with another engineered and certified solution. We then designed the space, built the new raised floor and got underway with the rest of the fit out.